Reem Hills- Portable Water Works Phase 1-Package
1.Installation and Commissioning DN 800 MM DI Line 715 meter
2.Installation and Commissioning DN 800 MM BFV Valve, air Valve and wash out chamber
3.Construction of GRP duct DN 1500 dia 25 meter
4.Tie in connection with DN 800 DI Line Package 2