P2327 Design & Build of the Main Road Connecting Khalifa Bin Zayed International Street and Ras Ghumais
1. Installtion, Tie in and commissioning DN 500 MM DI Line 8043 meter
2. Installtion, Tie in and commissioning DN 400 MM DI Line 1895 meter
3. Installtion, Tie in and commissioning DN 100 MM DI Line 245 meter